[1]
Latif Chasanudin, M. et al. 2023. Cost and Time Comparison Analysis of Conventional Slab with Half Slab Method for PT. AMP Surabaya Office Building Construction. Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan. 8, 2 (Sep. 2023), 145–156. DOI:https://doi.org/10.30736/cvl.v8i2.1101.