Latif Chasanudin, M., Sundari, T., Yulianto, T., Wahyu Nugroho, M., & Ramadhani, R. (2023). Cost and Time Comparison Analysis of Conventional Slab with Half Slab Method for PT. AMP Surabaya Office Building Construction. Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan, 8(2), 145–156. https://doi.org/10.30736/cvl.v8i2.1101