Rizal Mantovani, M., & Beatrix, M. (2023). Cost and Time Comparison Analysis Using Microsoft Project (Case Study: Phase VII Work of the Surabaya Tanjung Perak Berlian Pier Structure Strengthening Project). Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan, 8(2), 171–180. https://doi.org/10.30736/cvl.v8i2.1110