[1]
Azmi Umroh and Ilham 2024. Analisis Manajemen Risiko K3 Menggunakan Metode HAZOP (Hazard and Operability Study) pada Bengkel Bolot Motor. Joutica. 9, 2 (Sep. 2024), 92–100. DOI:https://doi.org/10.30736/informatika.v9i2.1228.