Skema Pertahanan dalam Kondisi Kontingensi N-2 Saluran Pemalang-Ungaran dan Depok-Tasikmalaya

Authors

  • kevin rachman firdaus Teknik Elektro Universitas Brawijaya Malang
  • Hadi Suyono Teknik Elektro Universitas Brawijaya Malang
  • Tri Nurwati Teknik Elektro Universitas Brawijaya Malang
  • Rini Nur Hasanah Teknik Elektro Universitas Brawijaya Malang

DOI:

https://doi.org/10.30736/je-unisla.v6i1.593

Keywords:

Transmission Line, Defense Scheme, Load Shedding, Generator Tripping, Partial Blackout

Abstract

A fault of transmission lines in the process of transmitting electricity has a huge impact. One of the impacts of the disruption in August 2019 on the island of Java was the partial blackout in the Java-Bali electricity system due to contingency of the 500 kV Pemalang-Ungaran and Depok-Tasikmalaya transmission lines. Prevention of partial blackouts is required by devising defense schemes that can compensate for the impact of these contingency events. Defense schemes can be done by doing load shedding and generator tripping. Both methods are able to evacuate a large amount of power in a relatively fast time, so that it can improve the frequency value in a short time. The system frequency response has experienced recovery with an increase in frequency in the West Java Island and a decrease in the frequency in the East Java Island. The result of load shedding is the disconnection of 6 load buses in 5 main stages of the system and the result of generator tripping is the disconnection of 2-unit generators in 2 stages of the system.

Downloads

Download data is not yet available.

References

Kementrian Energi dan Sumber Daya Mineral. (2018). Pengesahan Rencana Usaha Penyediaan Tenaga Listrik PT Perusahaan Listrik Negara (Persero) Tahun 2018. Jakarta: ESDM.

Karim, K. Soeprijanto, A. & Purnomo, M. H. (2008). Pelepasan Beban Otomatis Menggunakan ANN-CBP-FLC pada Sistem Tenaga Listrik Industri Besar. Prosidin Seminar Nasional Aplikasi Teknologi Informasi (SNATI) 2008: Bidang Ketenaga listrikan. Jogjakarta: UII

Che, L. Liu, X. & Li, Z. (2018). Preventive Mitigation Strategy for the Hidden N-k Line Contingencies in Power System. IEEE Transactions on Reliability, 67(3), 1060-1070

PT. PLN (Persero) UIP3B (2015). Defence Scheme Sistem Jawa-Bali 2015. Jakarta: PLN

Noviyani, E. Junaidi. & Harjono, P. (2016). Studi Pelepasan Beban pada Skema Pertahanan (Defense Scheme) Jaringan Sistem Khatulistiwa. Jurnal Teknik Elektro Tanjungpura, 2(1), 1-7

Pimjaipong, W. Junrussameevilai, T. & Maneerat, N. (2005). Blackout Prevention Plan – The Stability, Reliability and Security Enhancement in Thailand Power Grid. IEEE/PES Transmission and Distribution Conference & Exhibition: Asia and Pacific. Dalian, China

Elansari, A. S. Edrah, M. F. & Khaled, S. M. (2012). Improve Transient Frequency Response by Adjusting Generators Over Frequency Relay. IEEE International Conference on Power and Energy (PECon). Sabah, Malaysia: 2-5 Desember 2012.

Salim, N.A. Zakaria, Z. M. & Aziz, M. A. A. (2017). Development of Graphical User Interface to Monitor the Power System Frequency Stability due to Cascading Failure. 2017 3rd International Conference on Power Systems and Renewable Energy Technology (PGSRET): 180-184. Johor Baru: IEEE

Kementrian Energi dan Sumber Daya Mineral. (2007). Aturan Jaringan Sistem Tenaga Listrik Jawa-Madura-Bali. Jakarta: ESDM

Rachman, A. (2016). Analisis Kontingensi pada Sistem Jawa-Bali 500kV untuk Mendesain Keamanan Operasi. Proceeding Seminar Tugas Akhir Jurusan Teknik Elektro FTI – ITS. Surabaya: ITS

PlumX Metrics

Published

15-03-2021

How to Cite

firdaus, kevin rachman, Suyono, H., Nurwati, T., & Nur Hasanah, R. (2021). Skema Pertahanan dalam Kondisi Kontingensi N-2 Saluran Pemalang-Ungaran dan Depok-Tasikmalaya. JE-Unisla, 6(1), 464–470. https://doi.org/10.30736/je-unisla.v6i1.593

Issue

Section

editorial elektro