Koordinasi Sistem Proteksi Trafo Distribusi 20 KV (Studi Lapangan PT. PLN Persero Unit Lamongan)

Authors

  • Rohmat Syaifuddin Universitas Islam Lamongan
  • Zainal Abidin Universitas Islam Lamongan
  • Affan Bachri Universitas Islam Lamongan

DOI:

https://doi.org/10.30736/jt.v12i1.400

Keywords:

Disturbances, Transformer, Settings, OCR-GFR

Abstract

Electricity distribution systems that use aerial or ground wires often experience various disturbances. Disturbances that often occur are symmetry disturbances or asymmetric disturbances which can be in the form of a short circuit of one phase to the ground, between phases or the breakup of one or more. To determine the magnitude of the fault current is needed transformer distribution system analysis to determine the disturbances that will occur. The transformer which is the main equipment in a GI must be considered to get the right current and safety circuit. Designing an appropriate transformer setting is an effort to protect equipment, systems and consumer needs from interference that may occur in the distribution system. Calculation of the fault current and the magnitude of the transformer nominal current will be used as an important reference in determining the transformer setting in the distribution of voltage to consumers. From the results of these calculations, it can be concluded that the relay feeder performance time is slower than the relay time in the calculation. The data in the field is still in a suitable condition (the difference is not too far away), so that the overall OCR - GFR settings in the field are still in good condition.

Downloads

Download data is not yet available.

References

Ade Wahyu Hidayat, Herri Gusmedi, Lukmanul Hakim, Dikpride Despa. 2013.†Analisa Setting Rele Arus Lebih dan Rele Gangguan Tanah pada Penyulang Topan Gardu Induk Teluk Betung†Jurusan Teknik Elektro Fakultas Teknik Universitas Lampung.

Badaruddin, Budi Wirawan. 2014.†Setting Koordinasi Over Current Relay pada Trafo 60 MVA 150/20 Kv dan Penyulang 20 KV†Program Studi Teknik Elektro, Fakultas Teknik Universitas Mercu Buana Jakarta.

Eka Setya Laksana.2007.†Analisis Koordinasi Sistem Pengaman Incoming dan Penyulang Transformator 3 di GI Sukolilo Surabayaâ€Fakultas Teknologi Industri, Jurusan Teknik Elektro, Institut Teknologi Sepuluh Nopember Surabaya Kampus ITS Sukolilo Surabaya.

https://ugmmagatrika.wordpress.com/2014/04/26/pembagian-jaringan-distribusi-dan-sistem-proteksinya/.

http://desijayantr.blogspot.co.uk/2012/06/jurnal-koordinasi-relay-proteksi-pada.html.

http://sardest.blogspot.co.uk/2012/06/proteksi-sistem-tenaga-listrik.html.

http://dunia-listrik.blogspot.co.id/2008/12/sistem-distribusi-tenaga-listrik.html.

http://dinus.ac.id/repository/docs/ajar/2SistemDistribusi.pdf.

Parasuraman, A., Zeithaml, V. A., Berry, L.L., 1985, A Concseptual Model of Service Quality and Its Implications for Future Research. Journal of Marketing, 49. ,Mahasiswa Jurusan Teknik Elektro FTI ITP Padang.

Rize Taufiq Ramadhan. 2014.†Studi Koordinasi Sistem Pengaman Penyulang Trafo Iv Di Gardu Induk Waru†Kementerian Pendidikan Nasional Universitas BrawijayaFakultas Teknik Malang.

Zulkarnaini, Mohammad Iqbal. 2015.†Perhitungan Koordinasi Relay Proteksi Ocr / Gfr Dengan Menggunakan Software Mathcad Pada Trafo Daya Unit Ii 20 Mva Gi Salak†Dosen Jurusan Teknik Elektro FTI ITP Padang

PlumX Metrics

Published

2020-03-19

How to Cite

Syaifuddin, R., Abidin, Z., & Bachri, A. (2020). Koordinasi Sistem Proteksi Trafo Distribusi 20 KV (Studi Lapangan PT. PLN Persero Unit Lamongan). Jurnal Teknika, 12(1), 41–46. https://doi.org/10.30736/jt.v12i1.400

Issue

Section

Jurnal teknika