Cost and Time Comparison Analysis of Conventional Slab with Half Slab Method for PT. AMP Surabaya Office Building Construction

Authors

  • Muchammad Latif Chasanudin Universitas Hasyim Asy'ari
  • Titin Sundari Universitas Hasyim Asy'ari
  • Totok Yulianto Universitas Hasyim Asy'ari
  • Meriana Wahyu Nugroho Universitas Hasyim Asy'ari
  • Rahma Ramadhani Universitas Hasyim Asy'ari

DOI:

https://doi.org/10.30736/cvl.v8i2.1101

Keywords:

Conventional, Cost, Half Slab, Time

Abstract

This study aims to analyze the application of Precast half-slab formwork with conventional formwork in terms of cost and time. The use of precast concrete is based on advantages in terms of economy, efficiency, speed in implementation, and energy consumption which has an impact on the environment. This office construction project was carried out in the Graha Family area in Surabaya. This project uses the half slab precast method, where half of the plate (precast) is precast with a thickness of 7 cm, and the other half is cast on site (topping). In this final project research, an analysis and comparison of several methods of floor slab work is carried out so that it can be seen which method is considered more profitable. Analysis of conventional half slab and precast methods focuses on calculating direct costs in terms of materials, tools, and workers' wages as well as calculating the time needed to complete the work.

Downloads

Download data is not yet available.

References

Diah Kurniawati Ningtyas, Arilia Regita Tri Cahyani, Z. R. Kamandang, Muh. Darul Muttaqin, and Rizky Nur Cahyanto, “Comparative Analysis of The Cost of Conventional and Precast Concrete Slabs on High-Rise Building Projects,” Journal of Civil Engineering Science and Technology (CI-TECH), vol. 3, no. 2, pp. 96–99, Oct. 2022, doi: 10.33005/ci-tech.v3i2.63.

I. G. Pamungkas, F. N. Abdi, and M. Jamal, “Analisis Perbandingan Metode Pelaksanaan Halfslab Dengan Cast In Situ Dan Floordeck Terhadap Biaya Dan Waktu Pada Pelat Lantai Proyek Pembangunan Apartemen,” Jurnal Sipil Sains, vol. 8, no. 16, 2018.

O. Wijaksono, J. Tistigindi, and T. H. Bagio, “Analisis Perbandingan Efesiensi Waktu dan Biaya Antara Metode Konvensional Slab, Precast Half Slab dan Precast Full Slab Pada Proyek Bangunan Hotel Bertingkat Di Surabaya,” Seminar Nasional Sains dan Teknologi 2018, vol. 17, pp. 1–9, 2018.

R. C. Putra, “Analisis Metode Konstruksi Half-Slab Untuk Lantai Beton.” Universitas Andalas, 2016.

Mt. Ari N U G Rah A N U Rja Man, “Basic Precast System and Precast Outlook in Seismic Region of Indonesia,” no. August, 2018.

D. Aprisandi, “Analisis Biaya Dan Waktu Metode Half Slab Dalam Pembangunan Proyek Konstruksi,” Jurnal Lingkungan Dan Sipil, vol. 1, no. 1, pp. 51–61, 2018.

D. H. Wisanggeni, “Perbandingan Sistem Pelat Konvensional dan Precast Half Slab Ditinjau Dari Segi Waktu dan Biaya Pada Proyek My Tower Apartement Surabaya,” Surabaya: Institut Teknologi Sepuluh Nopember, 2017.

I. Muttaqin, N. Faqih, and A. Juara, “Analysis of the Precast Half Slab Method in Batang I Industrial Workers Flats Development Project,” Civilla: Jurnal Teknik Sipil Universitas Islam Lamongan, vol. 8, no. 1, pp. 33–46, 2023.

I. A. Dewi and S. Sukobar, “Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Apartemen Solo Urbana Residence Tower D dengan Metode Half Slab,” Jurnal Teknik ITS, vol. 11, no. 2, 2022, doi: 10.12962/j23373539.v11i2.85209.

R. Putranto and R. Ariyansyah, “Construction Method Of Abila Precast Concrete For Housing,” Jurnal Teknik-Sipil, vol. 22, no. 1, p. 70, Jun. 2022, doi: 10.26418/jtsft.v22i1.54713.

Y. Liu, J. Huang, X. Chong, and X. Ye, “Experimental investigation on flexural performance of semi?precast reinforced concrete one?way slab with joint,” Structural Concrete, vol. 22, no. 4, pp. 2243–2257, Aug. 2021, doi: 10.1002/suco.202000676.

V. Aprilia, “Analisis Perbandingan Sistem Struktur Pelat Konvensional Dan Half Slab Ditinjau Dari Segi Biaya Dan Waktu.” Universitas Komputer Indonesia, 2021.

I. Riyadi, E. Handayani, and W. Dony, “Analisa Perbandingan Sistem Pelat Konvensional dengan Sistem Precast Half Slab dalam Segi Waktu dan Biaya,” Jurnal Civronlit Unbari, vol. 7, no. 2, p. 63, 2022, doi: 10.33087/civronlit.v7i2.100.

M. A. E. Widyaningtyas, H. Darjanto, and M. I. Setiawan, “Efficiency Of Using Some Floor Plate Methods In Development Planning Brawijaya High School Dormitory, Kediri, East Java,” ADRI International Journal of Sciences, Engineering and Technology, vol. 7, no. 1, pp. 63–71, 2022.

R. Rahman, “Analisis Perbandingan Biaya Pelat Lantai Antara Metode Precast Half Slab Dan Metode Konvensional (Cost Comparison Analysis Between Precast Half Slab Method And Conventional Method)(Studi Kasus: Proyek Pembangunan Pasar Prambanan),” 2019.

R. Yanita, K. Mochtar, and N. Huda, “Implementasi Value Engineering (VE) Pada Desain Bangunan Tinggi : Metode Pelat Lantai Pracetak Half Slab Terhadap Cast-in-situ,” Technopex-2018InstitutTeknologi Indonesia, no. December, pp. 99–105, 2018.

Dwi Oktavianto and Nurul Rochmah, “Perencanaan Struktur Gedung Kantor Otoritas Jasa Keuangan (Ojk) Kawasan Regional 4 Dengan Metode Beton Pracetak,” PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, vol. 11, no. 2, pp. 229–239, 2022, doi: 10.22225/pd.11.2.5367.229-239.

T. Elita Saragi and N. Kartianus Zalukhu, “Analisa Perbandingan Pelaksanaan Struktur Pelat Lantai Metode Konvensional, Boundeck Dan Precast Full Slab Ditinjau Dari Segi Waktu Dan Biaya Pada Proyek Pembangunan Gedung Gbkp Tanah Merah Binjai,” Jurnal Teknik Sipil, vol. 1, no. 2, pp. 38–52, 2022.

M. Romi, I. R. Sitompul, and R. T. K. Iriana, “Perbandingan Sistem Struktur dan Biaya Pelat Lantai Metode Precast Half Slab dan Metode Konvensional,” Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains, vol. 3, no. 2, pp. 1–15, 2016.

N. C. Fertilia, M. Fadhiil, and D. Sukmana, “Comparison Analysis of Conventional Method Floor Slabs With Half Slab Method Against Cost and Time of XYZ Project,” vol. 3, no. 2, pp. 234–240, 2021.

M. Kurniawan, “Perbandingan Analisis Struktur dan Efisiensi Biaya Struktur Slab on Pile Menggunakan Metode Precast Half-Slab dan Metode Monolite, Serta Kombinasi Mutu Beton Slab on Pile (Studi Kasus Jembatan Perawang) Comparation Structural Analysis and Cost Efficiency ,” vol. 16, no. 1, pp. 46–62, 2016.

U. Suaiba, “Analisa Perbandingan Sistem Half Slab Dan Plat Konvensional Ditinjau Dari Segi Waktu Dan Biaya Pada Proyek Apartemen Gunawangsa Tidar Surabaya,” Elemen: Jurnal Teknik Sipil, vol. 1, no. 1, pp. 1–9, 2019.

S. Edhi, “Analisa Perbandingan Waktu Dan Biaya Metode Konvensional Dengan Flat Slab Struktur Pelat Lantai Apartemen Grand Dharmahusada Lagoon Surabaya,” Analisa Perbandingan Waktu Dan Biaya Metode Konvensional Dengan Flat Slab Struktur Pelat Lantai Apartemen Grand Dharmahusada Lagoon Surabaya, 2019.

Downloads

PlumX Metrics

Published

2023-09-15

How to Cite

Latif Chasanudin, M., Sundari, T., Yulianto, T., Wahyu Nugroho, M., & Ramadhani, R. (2023). Cost and Time Comparison Analysis of Conventional Slab with Half Slab Method for PT. AMP Surabaya Office Building Construction. Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan, 8(2), 145–156. https://doi.org/10.30736/cvl.v8i2.1101