Analysis of Heavy Equipment Productivity in the Construction of the Surabaya State Polytechnic Integrated Lecture Building Project

Authors

  • Mochamad Ilham Zulfar Universitas Pembangunan Nasionak "Veteran" Jawa Timur
  • Fernanda Arya Pramudya Universitas Pembangunan Nasional “Veteran” Jawa Timur
  • Aulia Dewi Fatikasari Universitas Pembangunan Nasional “Veteran” Jawa Timur

DOI:

https://doi.org/10.30736/cvl.v10i1.1356

Keywords:

Building, Productivity, Project, Excavator

Abstract

Building construction is intensively carried out in Indonesia. That is because Indonesia is a developing country that needs quite a lot of infrastructure, be it buildings, offices, roads, bridges, or ports, especially at the Surabaya State Shipbuilding Polytechnic which is building an Integrated Lecture Building. The development process certainly does not escape the need for heavy equipment, such as excavators. Heavy equipment is a crucial requirement in building construction projects, this is because heavy equipment is a means of supporting work in the project, for example excavation work. Because excavators are important tools in building construction projects, it is necessary to analyze the productivity of heavy equipment. This study aims to analyze the productivity of excavators so that they can improve operational efficiency, save costs, and determine the duration of work. 

Downloads

References

D. H. Putra and F. Nugraheni, “Prosiding Kolokium Program Studi Teknik Sipil (KPSTS) FTSP UII,” 2018.

A. Firda, B. Asmawi, Akhirini, and Parlaungan Dolly, “PRODUKTIVITAS DAN EFEKTIVITAS ALAT BERAT PADA PEKERJAAN LAPIS PONDASI PROYEK REHABILITASI JALAN,” JURNAL DEFORMASI, Jun. 2023.

D. Febrianti, “Analisis Produktivitas Alat Berat Pada Pekerjaan Timbunan,” 2017.

D. D. Supit, “ANALISA PRODUKTIVITAS DAN EFISENSI ALAT BERAT UNTUK PEKERJAAN TANAH, DAN PEKERJAAN PERKERASAN BERBUTIR,” DynamicSainT, Apr. 2020.

S. Janizar and A. Ardianto, “ANALISIS EFEKTIVITAS PENGGUNAAN ALAT BERAT PADA SUATU PROYEK KONSTRUKSI (Studi Kasus : Pembangunan Kolam Retensi Wilayah Sirnaraga-Kota Bandung),” 2023.

A. F. R. Rambi, J. Tjakra, and P. A. K. Pratasis, “ANALISIS INVESTASI ALAT BERAT PROYEK JALAN PT. GADING MURNI PERKASA,” Jurnal Sipil Statik, vol. 6, no. 11, pp. 887–894, 2018.

D. Arista and P. N. Prasetyono, “PRODUKTIVITAS ALAT BERAT EXCAVATOR KOMATSU PC78 UNTUK PEKERJAAN GALIAN PADA PEMBANGUNAN GEDUNG RUMAH SAKIT SITI KHODIJAH MUHAMMADIYAH TAHAP 3 CABANG SEPANJANG.”

A. Kaprina, S. Winarto, Y. S. Cahyo, F. Teknik, and U. Kadiri, “ANALISA PRODUKTIFITAS ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS SYARIAH DAN ILMU HUKUM IAIN TULUNGANGUNG,” 2018.

D. Febrianti and Zakia, “ANALISIS PRODUKTIVITAS DANWAKTU PENGGUNAAN ALAT BERAT EXCAVATOR PADA PEKERJAANGALIAN TANAH,” SeminarNasional, 2018.

D. N. Setiawati and A. Maddeppungeng, “Analisis Produktifitas Alat Berat Pada Proyek Pembangunan Pabrik Krakatau (Dwi Novi-Andi) ANALISIS PRODUKTIVITAS ALAT BERAT PADA PROYEK PEMBANGUNAN PABRIK KRAKATAU POSCO ZONE IV DI CILEGON.”

rifatul Syirat, S. Bahri Bahar, and M. S. Sayfullah, “Analisis Produktivitas Penggunaan Excavator pada Pekerjaan Peningkatan Jalan Lingkar Ruas 2 Sorawolio-Bukit Asri,” vol. 9, no. 1, 2024, doi: 10.35326/scej.v9i1.6096.

A. Jaya, I. Lakawa, S. Hawa, and M. S. Bona, “Analisis Kinerja Alat Berat Pada Proyek Normalisasi dan Perkuatan Tebing Sungai,” Sultra Civil Engineering Journal, Mar. 2022.

M. A. Ronald Simanjuntak, “PERAN EXCAVATOR TERHADAP KINERJA PROYEK KONSTRUKSI RUMAH TINGGAL DI JAKARTA SELATAN,” 2013.

G. Raya Prima, E. Hafudiansyah, K. Kunci, A. Berat, and J. Tol, “Akselerasi: Jurnal Ilmiah Teknik Sipil PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PROYEK JALAN TOL (Studi Kasus: Ruas Jalan Tol Pematang Panggang-Kayu Agung Seksi 2, Ogan Komering Ilir, Sumatera Selatan)”.

D. Febrianti, “ALAT BERAT EXCAVATOR”.

B. Billy Kalengkongan Tisano Tj Arsjad and J. B. Mangare, “ANALISA PERHITUNGAN PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PEMATANGAN LAHAN PEMBANGUNAN TOWER SUTET LIKUPANG-PANIKI,” Jurnal Sipil Statik, vol. 8, no. 1, pp. 99–106, 2020.

PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA NOMOR 8 TAHUN 2023. [Online]. Available: www.peraturan.go.id

R. Martin Sokop and dkk, “Analisa Perhitungan Produktivitas Alat Berat Gali-Muat (Excavator) Dan Alat Angkut (Dump Truck) Pada Pekerjaan Pematangan Lahan Perumahan Residence Jordan Sea,” JurnalTekno, vol. 16, p. 6, 2018.

B. G. Kalalo, M. Sibi, and A. K. T. Dundu, “MANAJEMEN ALAT BERAT PADA PEKERJAAN BENDUNGAN LOLAK,” Jurnal Sipil Statik, vol. 8, no. 5, pp. 731–740.

A. Ravanelli Dei Rizaldi and H. Dani, “Produktivitas Alat Berat Excavator Caterpillar 320 Pada Pekerjaan Galian Tanah Di Proyek Pekerjaan Kontruksi Fisik dan Bangunan Rumah Sakit UPT Vertikal Surabaya,” 2024.

Downloads

PlumX Metrics

Published

2025-03-17

How to Cite

Zulfar, M. I., Fernanda Arya Pramudya, & Aulia Dewi Fatikasari. (2025). Analysis of Heavy Equipment Productivity in the Construction of the Surabaya State Polytechnic Integrated Lecture Building Project. Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan, 10(1), 69–76. https://doi.org/10.30736/cvl.v10i1.1356

Issue

Section

Jurnal CIVILA