Study of Progress Expected Results Based on Percentage of Construction Work Plan Duration
DOI:
https://doi.org/10.30736/cvl.v6i2.628Keywords:
progress, expected value, plan time duration waktu, construction workAbstract
Abstract. Controlling how construction work is completed is critical to success. Generally, the result value method is used as the tool. Although this method has been applied to a variety of different types of construction work, the tool has been limited to a single project. This study examines the total value of completed construction work. Because the duration of construction work varies, the researchers refer to the percentage of the plan's duration. The percentages are set at 25%, 30%, and 50%. There have been 17 completed building construction projects between 2017 and 2018. Additionally, a comparison sample of construction work is used. The results of the data processing are pessimistic, most likely, optimistic, and hopeful. Additionally, the expected value is compared to a reference value. The expected values for the percentages of 25%, 30%, and 50% are (-2.425), (1.071), and 50%, respectively (2.275). Indeed, the expected value obtained is not the same as the comparison value. The contractor can prepare the necessary resources by knowing the value of the expected yield at a certain percentage of the duration.
Â
Downloads
References
S. Robintang Tua and Mardiaman, “Pengendalian Biaya Menggunakan Metode Hasil Pelaksanaan Proyek (kasus: Pembangunan Pabrik Kelapa Sawit),†in Konferensi Nasional Teknik Sipil 10, 2016, pp. 31–40.
R. U. Farooqui, E. Hussain, M. Umer, and S. H. Lodi, "Factors Affecting Construction Cost in the Pakistani Construction Industry," in Third International Conference on Construction in Developing Countries (ICCIDC–III), 2012, no. July, pp. 161–168.
O. Bamitale, Aiyewalehinmi, and O. . Omolayo, "Most Critical Factors Responsible For Cost Overruns In Nigeria Building Construction Industry," J. Multidiscip. Eng. Sci. Stud., vol. 5, no. February, pp. 2500–2507, 2019, doi: 10.13140/RG.2.2.35471.74401.
M. Sulaiman, “Analisis Penyebab Keterlambatan Pelaksanaan Proyek Ditinjau Dari Waktu Pelaksanaan Di Provinsi Aceh,†J. Tek. Sipil, vol. 1, no. 2, pp. 405–418, 2017.
Mardiaman and Indriasari, “FAKTOR-FAKTOR PENENTU UTAMA KETERLAMBATAN PADA PEKERJAAN KONSTRUKSI PABRIK ( STUDI KASUS : PABRIK KAWASAN CIKARANG ) Pekerjaan konstruksi sifatnya sangat tidak pasti . Waktu selesainya setiap item pekerjaan dalam lingkup proyek bisa cepat dan lambat . Ket,†e-Journal CENTECH 2020, vol. 2, no. 1, pp. 1–11, 2021.
Junaidi, H. Tarore, G. Y. Malingkas, and D. R. O. Walangitan, “Pengendalian Waktu Dan Biaya Pada Tahap Pelaksanaan Proyek Dengan Menggunakan Metode Nilai Hasil (Studi Kasus : Proyek Lanjutan Pembangunan Gedung PIP2B Kota Manado),†J. Sipil Statik, vol. 1, no. 1, pp. 44–52, 2012.
D. K. Sudarsana, “PENGENDALIAN BIAYA DAN JADUAL TERPADU PADA PROYEK KONSTRUKSI.,†J. Ilm. Tek. Sipil, vol. 12, no. 2, pp. 187–195, 2008.
J. Zawistowski, "Application of modified earned value method for assessing the risk and progress of construction projects," Mod. Build. Mater. Struct. Tech., no. Pmi, pp. 557–560, 2010.
T. Baumann, A. Dziadosz, Ol. Kaplinski, and M. Rejment, “Range of Aplication and Limitations of the Earned Value Method in Construction Project Estimation Zakres Stosowania I Ograniczenia Metody Earned Value Do Oceny Przedsięwzięcia,†Tech. Trans. Civ. Eng., 2014.
M. Fauzan and Mawardi, “Evaluasi Kemajuan Proyek Dengan Metode Pengendalia Kinerja Nilai Hasil Proses Waktu Dan Biaya,†J. Penelit. Tek. Inform. Univ. Malikussaleh, Lhokseumawe Aceh, vol. 2, no. 1, pp. 77–88, 2015.
A. Czarnigowska, "Earned value method as a tool for project control," Bud. i Archit., vol. 3, no. 2, pp. 015–032, 2008, doi: 10.35784/bud-arch.2320.
M. S. Sauain, T. A. T. Mahmood, and T. Mahmood, "Monitoring project performance through earned value analysis," in Proceedings of the 2013 International Conference on Information, Operations Management and Statistics (ICIOMS2013), 2013, pp. 2–6.
Noumeiry and A. Mursadin, “Kajian Faktor-Faktor Yang Berpengaruh Terhadap Kinerja Proyek Gedung di Kota Samarinda,†J. Teknol. Berkelanjutan, vol. 2, no. 1, pp. 29–40, 2017.
M. Nadiasa, A. A. D. P. Dewi, and S. Pameke, “Analisis Pengaruh Lokasi Terhadap Biaya Proyek Irigasi (Studi Kasus : Pengangkutan Material Ke Lokasi Proyek Irigasi Di Kabupaten Gianyar),†J. Ilm. Tek. Sipil, vol. 18, no. 2, pp. 130–136, 2014.
Mardiaman, "Proportion Of Resource Component Cost In Multi-Story Buildings : Indonesia Case," Solid State Technol., vol. 63, no. 5, pp. 5785–5794, 2020.
J. Atmaja, E. R. Syofyan, and A. Fadillah, "Perbandingan Cost Significant Model Dengan Metode Parametrik Untuk Estimasi Biaya Gedung Bertingkat 2 di Provinsi Sumatera Barat Comparison of Cost Significant Models with Parametric Methods for Estimating the Cost of 2-Storey Buildings in Sumatra Provinc," vol. 14, pp. 43–57, 2018.
A. Asmi and J. C. S. Pratama, “Identifikasi Faktor-Faktor Keterlambatan Dalam Proyek Konstruksi Di Jakarta,†in jurnal.umj.ac.id/index.php/semnastek, 2016, no. November, pp. 1–12.
H. Hassan, J. B. Mangare, and P. A. K. Pratasis, “Faktor-faktor penyebab keterlambatan pada proyek konstruksi dan alternatif penyelesaiannya (studi kasus : di manado town square III),†J. Sipil Statik Vol.4, vol. 4, no. 11, pp. 657–664, 2016.
L. Le-Hoai, Y. D. Lee, and J. Y. Lee, "Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries," KSCE J. Civ. Eng., vol. 12, no. 6, pp. 367–377, 2008, doi: 10.1007/s12205-008-0367-7.
M. Głuszak and A. Les̈niak, "Construction Delays in Clients Opinion - Multivariate Statistical Analysis," Procedia Eng., vol. 123, pp. 182–189, 2015, doi: 10.1016/j.proeng.2015.10.075.
R. F. Aziz and A. A. Abdel-Hakam, "Exploring delay causes of road construction projects in Egypt," Alexandria Eng. J., vol. 55, no. 2, pp. 1515–1539, 2016, doi: 10.1016/j.aej.2016.03.006.
T. Gebrehiwet and H. Luo, "Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study," 2017, doi: 10.1016/j.proeng.2017.07.212.
M. M. Marzouk and T. I. El-Rasas, "Analyzing delay causes in egyptian construction projects," J. Adv. Res., vol. 5, no. 1, pp. 49–55, 2014, doi: 10.1016/j.jare.2012.11.005.
D. Astina, I. Widhiawati, and I. Joni, “Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi Di Kabupaten Tabanan,†J. Ilm. Elektron. Infrastruktur Tek. Sipil, vol. 1999, 2012.
S. K. Bhosekar and G. Vyas, "Cost Controlling Using Earned Value Analysis in Construction Industries," Int. J. Eng. Innov. Technol., vol. 1, no. 4, pp. 324–332, 2012, [Online]. Available: https://www.researchgate.net/profile/Gayatri_Vyas2/publication/265285339_Cost_Controlling_Using_Earned_Value_Analysis_in_Construction_Industries/links/553b16c50cf2c415bb08ffcf/Cost-Controlling-Using-Earned-Value-Analysis-in-Construction-Industries.pdf.
J. Konior and M. Szóstak, "The S-curve as a tool for planning and controlling of construction process-case study," Appl. Sci., vol. 10, no. 6, 2020, doi: 10.3390/app10062071.
D. Przywara and A. Rak, "Monitoring of time and cost variances of schedule using simple earned value method indicators," Appl. Sci., vol. 11, no. 4, pp. 1–13, 2021, doi: 10.3390/app11041357.
Bharath Arunmozhi K M and P. K. C, "Study On Project Forecasting and Control In Residential Building Using Earned Value Management," vol. 7, no. 2, pp. 301–308, 2018.
M. Gerawork Jembere, B. Bewket Mitikie, and E. Kelemework Yigzaw, "Performance Evaluation of Housing Construction Project, Using Earned Value Analysis; the Case of 20/80 Condominium Addis Ababa Bole Arabsa Site," Am. J. Eng. Technol. Manag., vol. 5, no. 4, p. 69, 2020, doi: 10.11648/j.ajetm.20200504.12.
A. Czemplik, "Application of earned value method to progress control of construction projects," Procedia Eng., vol. 91, no. TFoCE, pp. 424–428, 2014, doi: 10.1016/j.proeng.2014.12.087.
T. Baumann, Agnieszka, O. Kaplinski, and M. Rejment, "Range of aplication and limitations of the earned value method in construction project estimation," Czas. Tech., vol. 2, pp. 65–72, 2014, doi: 10.4467/2353737XCT.14.113.2563.
M. I. Pedro, J. Pereira, J. A. Filipe, and M. A. M. Ferreira, "An Approach to Earned Value Analysis (EVA): An Application to a Practical Case," Int. J Latest Trends Fin. Eco. Sc., vol. 1, no. 2, pp. 63–73, 2011, [Online]. Available: http://repositorio-iul.iscte.pt/handle/10071/5615.
M. T. Sitompul, “Penerapan Metode Monte Carlo Penjadwalan Proyek Konstruksi ( Studi Kasus : Proyek Pembangunan Apartemen The Reiz Condo Medan ),†North Sumatera University, 2018.
S. Milah, D. Nurmayadi, and A. R. Hendardi, “Analisis Pengendalian Waktu Proyek Konstruksi Menggunakan Earned Value Concept (EVC) Dan Critical Path Method (CPM),†J. Ilm. Tek. Sipil, vol. 1, no. 1, pp. 1–14, 2019.
M. Priyo and N. A. Wibowo, “Konsep Earned Value dalam Aplikasi Pengelolaan Proyek Konstruksi,†J. Ilm. Semesta Tek., vol. 11, no. 2, pp. 153–161, 2008.
Y. Frimpong, J. Oluwoye, and L. Crawford, "Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study," Int. J. Proj. Manag., vol. 21, no. 5, pp. 321–326, 2003, doi: 10.1016/S0263-7863(02)00055-8.
Mardiaman, "DETERMINING WEIGHTCRITERIA / SUB-CRITERIA IN SELECTING," Palarch's J. Archaeol. Egypt/Egyptology, vol. 17, no. 9, pp. 9485–9495, 2020, [Online]. Available: https://archives.palarch.nl/index.php/jae/article/view/5910/5786.
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish in this journal agree to the following terms:
-
- Copyright on any article is held by the author.
- The author grants the journal first publication rights with the work licensed concurrently under a Creative Commons Attribution License that allows others to share the work with an acknowledgment of authorship and initial publication of the work in this journal.
- Authors may make separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of that journal (for example, posting it to an institutional repository or publishing it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (for example, in an institutional repository or on their website) before and during the submission process, as doing so can lead to productive exchange, as well as earlier and greater citation of the published work.
- Published articles and related materials distributed under a Creative Commons Attribution-ShareAlike 4.0 International License
Civilla (Jurnal Teknik Sipil Universitas Islam Lamongan) by Universitas Islam Lamongan is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://jurnalteknik.unisla.ac.id/index.php/CVL/index