Productivity, Lightweight Concrete Block Wall, Time Study, AHSPAbstract
Labor productivity strongly impacts construction time and cost. While standard metrics like the PUPR Work Unit Price Analysis (AHSP) are widely used, actual field productivity often deviates due to specific site conditions and labor dynamics. This discrepancy necessitates localized empirical evaluation. Thus, this study analyzes lightweight concrete block wall installation productivity at Building X Project, Tasikmalaya, using the time study method. Field observations over three days involved one crew (one mason, two helpers). Data were collected using stopwatches and video recordings. The results showed that the average actual field productivity reached 12.20 m²/day, significantly surpassing the national AHSP standard of 7.69 m²/day, demonstrating that job-site performance can substantially exceed established national theoretical productivity benchmarks. Field labor coefficients were highly efficient at 0.082 OH/m² (mason) and 0.164 OH/m² (helpers). Time allocation analysis showed that the mason focused primarily on productive installation activities, while the two helpers exclusively performed supporting tasks such as material transport, block cutting, and mortar mixing, thereby maximizing overall work efficiency. These findings demonstrate that an efficient labor composition and clear task division can substantially improve productivity beyond applicable AHSP standards.
Downloads
References
[1] R. Asitha and M. Campbell, “Systematic Review of the Literature on Construction Productivity,” J. Constr. Eng. Manag., vol. 149, no. 6, p. 03123005, Jun. 2023, doi: https://doi.org/10.1061/JCEMD4.COENG-13045.
[2] S. Palikhe, S. Kim, and J. J. Kim, “Critical Success Factors and Dynamic Modeling of Construction Labour Productivity,” International Journal of Civil Engineering, vol. 17, no. 3, pp. 427–442, 2019, doi: https://doi.org/10.1007/s40999-018-0282-3.
[3] H. Karimi, T. R. B. Taylor, and P. M. Goodrum, “Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance,” Construction Management and Economics, vol. 35, no. 6, pp. 368–380, Jun. 2017, doi: https://doi.org/10.1080/01446193.2017.1294257.
[4] M. Lefoka and A. Windapo, “An Examination of Contextual Factors that Cause Variations in Labour Productivity,” in The Construction Industry in the Fourth Industrial Revolution, C. Aigbavboa and W. Thwala, Eds., Cham: Springer International Publishing, 2020, pp. 355–363. doi: https://doi.org/10.1007/978-3-030-26528-1_35.
[5] M. A. Surachman and P. E. Agustyawan, “Analisa Produktivitas Tenaga Kerja Harian dan Borongan pada Proyek RSUD Dr. Soegiri Lamongan,” Civilla: Jurnal Teknik Sipil Universitas Islam Lamongan, vol. 4, no. 1, pp. 220–227, 2019, [Online]. Available: https://jurnalteknik.unisla.ac.id/index.php/CVL/article/view/312
[6] R. Pellerin and N. Perrier, “A review of methods, techniques and tools for project planning and control,” Int. J. Prod. Res., vol. 57, no. 7, pp. 2160–2178, Apr. 2019, doi: https://doi.org/10.1080/00207543.2018.1524168.
[7] P. Dallasega, E. Marengo, and A. Revolti, “Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives,” Production Planning & Control, vol. 32, no. 4, pp. 257–282, Mar. 2021, doi: https://doi.org/10.1080/09537287.2020.1725170.
[8] B. H. Osman, Z. Chen, and A.-B. A. Elamin, “Experimental study on basic mechanical properties of lightweight self-insulation concrete block masonry in Northeast cold region,” Sci. Rep., vol. 15, no. 1, p. 28261, 2025, doi: https://doi.org/10.1038/s41598-025-14346-9.
[9] B. Tropschuh, J. Cegarra, and O. Battaïa, “Integrating physiological and mental aspects in employee scheduling: an overview for practitioners in production management,” Int. J. Prod. Res., vol. 62, no. 6, pp. 2093–2106, Mar. 2024, doi: https://doi.org/10.1080/00207543.2023.2217278.
[10] Kementerian PUPR, Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia Nomor 28/Prt/M/2016 Tentang Pedoman Analisis Harga Satuan Pekerjaan. Indonesia, 2016. [Online]. Available: https://peraturan.go.id/id/permen-pupr-no-28-prt-m-2016-tahun-2016
[11] P. Ballesteros-Pérez, E. Sanz-Ablanedo, R. Soetanto, G.-C. Ma. C, G. D. Larsen, and A. Cerezo-Narváez, “Duration and Cost Variability of Construction Activities: An Empirical Study,” J. Constr. Eng. Manag., vol. 146, no. 1, p. 04019093, Jan. 2020, doi: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001739.
[12] Y. Hernandi and J. S. Tamtana, “Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja pada Pelaksanaan Konstruksi Gedung Bertingkat,” JMTS: Jurnal Mitra Teknik Sipil, vol. 3, no. 2, pp. 299–312, 2020, doi: https://doi.org/10.24912/jmts.v3i2.6985.
[13] C. Caruana, C. Yousif, P. Bacher, S. Buhagiar, and C. Grima, “Determination of thermal characteristics of standard and improved hollow concrete blocks using different measurement techniques,” Journal of Building Engineering, vol. 13, pp. 336–346, 2017, doi: https://doi.org/10.1016/j.jobe.2017.09.005.
[14] M. F. Ramadhan, R. Kukreja, and C. Duran, “Productivity Improvement through Work Measurement and Time Study Analysis,” RESWARA: Jurnal Riset Ilmu Teknik, vol. 2, no. 3, pp. 93–99, 2024, doi: https://doi.org/10.70716/reswara.v2i3.380.
[15] M. Roberto, A. Araújo, M. L. Varela, J. Machado, and J. P. Mendonça, “Methods time measurement on the optimization of a productive process: A case study,” in 2017 4th International Conference on Control, Decision and Information Technologies (CoDIT), 2017, pp. 980–985. doi: https://doi.org/10.1109/CoDIT.2017.8102726.
[16] K. Qi, E. K. Owusu, M.-F. Francis Siu, and P.-C. Albert Chan, “A systematic review of construction labor productivity studies: Clustering and analysis through hierarchical latent dirichlet allocation,” Ain Shams Engineering Journal, vol. 15, no. 9, p. 102896, 2024, doi: https://doi.org/10.1016/j.asej.2024.102896.
[17] D. Asmaroni and S. Sesaria, “Analisis Produktivitas Tenaga Kerja pada Pekerjaan Pagar Menggunakan Metode Time Study pada Pembangunan Kantor & Gudang Djarum DSO (Distric Sales Office) Pamekasan,” Rekayasa: Jurnal Teknik Sipil, vol. 6, no. 2, pp. 1–6, 2021, [Online]. Available: https://ejournal.unira.ac.id/index.php/jurnal_rekayasa_teknik_sipil/article/view/1446
[18] A. A. Pahrun, M. Y. Tuloli, and A. Utiarahman, “Field-Based Evaluation of Unit Price Coefficients for Red Brick Masonry Wall Construction: A Comparison with AHSP 2025,” Buletin Profesi Insinyur, vol. 9, no. 1, pp. 40–49, 2026, [Online]. Available: https://buletinppi.ulm.ac.id/index.php/bpi/article/view/303
[19] M. Goh and Y. M. Goh, “Lean production theory-based simulation of modular construction processes,” Autom. Constr., vol. 101, pp. 227–244, 2019, doi: https://doi.org/10.1016/j.autcon.2018.12.017.
[20] A. Ricardo, G. V. A, W. Kenneth, R. Omar, O. Michael, and O. Ibrahim, “Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time,” J. Constr. Eng. Manag., vol. 144, no. 3, p. 04017118, Mar. 2018, doi: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001438.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Hidayanto, Shanti Astri Noviani, Galih Rahmat Jatnika, Fitriana Sarifah

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish in this journal agree to the following terms:
-
- Copyright on any article is held by the author.
- The author grants the journal first publication rights with the work licensed concurrently under a Creative Commons Attribution License that allows others to share the work with an acknowledgment of authorship and initial publication of the work in this journal.
- Authors may make separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of that journal (for example, posting it to an institutional repository or publishing it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (for example, in an institutional repository or on their website) before and during the submission process, as doing so can lead to productive exchange, as well as earlier and greater citation of the published work.
- Published articles and related materials distributed under a Creative Commons Attribution-ShareAlike 4.0 International License
Civilla (Jurnal Teknik Sipil Universitas Islam Lamongan) by Universitas Islam Lamongan is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://jurnalteknik.unisla.ac.id/index.php/CVL/index